GET

Securities Trading

Get mtf order details

/api/v2/exchange/order_meta
AUTHENTICATIONBearer token · trading:readService ownermatching-and-trading-read-modelContract sourceCapability registry · plannedSTATUSPlanned · not executable
PLANNING CONTRACT · NOT CALLABLE

This page describes intended capability and integration boundaries so people and agents can prepare safely. Do not send this request or register it as an executable tool. Wait until the capability registry marks it implemented-contract, then re-fetch the deployed OpenAPI document and build the request from that machine contract.

Purpose and usage

What this endpoint does

Planned capability: list mtf order details through the authoritative market and trading service boundary.

When to use it

Do not call or register this operation as an executable agent tool yet. Use this page to plan the future mtf order details workflow; enable it only after the status becomes implemented-contract and the exact operation appears in deployed OpenAPI.

OUTCOME · Planned · Discover

What changes

None today: this route is not executable. Its intended behavior is: read-only projection; it grants no mutation, settlement, traffic, or authority change.

WHY IT MATTERS

  • Lets people and agents prepare for mtf order details without falsely presenting roadmap scope as a live capability.
  • Gives people and agents a contract-backed way to discover mtf order details.
  • Separates decision-support and reconciliation data from the controls that admit, match, publish, or settle an order.

ISOLATION + AUTHORITY

The authenticated owner, market, order, position, matching, risk, publisher, and settlement boundaries remain distinct. Documentation, contract visibility, and read access grant no execution authority; possession of a write scope still cannot bypass market status, risk, admission, allowlist, suspension, matching, publisher, or settlement gates. Current trading, matching, prediction, ingress, publisher, allowlist, suspension, market-status, and traffic controls remain frozen unless separately approved through their controlling process. This planning record grants no runtime authority, and only deployed OpenAPI can define an executable public contract.

BEFORE YOU CALL

  • First confirm that this operation is marked implemented-contract and exists in the currently deployed OpenAPI document; until then, no production request is valid.
  • Its capability-registry profile is provisional integration guidance, not an executable request schema.
  • Authenticate at the documented boundary: bearer.
  • Treat the capability-registry profile as design guidance only; deployed OpenAPI must define the executable request and response shapes.
  • Resolve the current market status, owner-specific restrictions, risk posture, and applicable trading freeze before relying on this result.

WHAT TO DO NEXT

  • Keep this operation disabled in clients, agents, SDKs, and workflow automation while it remains planned-contract.
  • Use the stated owner, lifecycle, authority boundary, and provisional mtf order details profile to prepare requirements and conformance tests without sending a request.
  • Monitor the capability registry for implemented-contract, then re-fetch deployed OpenAPI and validate its exact security, parameters, schemas, responses, and agent metadata before enabling the integration.

AGENT GUIDANCE

  • Never call this planned contract, include it in an executable tool registry, or infer runtime availability from this readable page.
  • Its capability-registry profile is provisional integration guidance, not an executable request schema.
  • Use mtf order details only for the purpose and lifecycle stage described by this operation; do not treat it as authority for an adjacent action.
  • Treat the capability-registry profile as design guidance only; deployed OpenAPI must define the executable request and response shapes.
  • Distinguish market data, owner-specific restrictions, order admission, matching, fills, positions, collateral, cancellation, settlement, and finality; no one state implies another.
  • Use response links and canonical identifiers instead of constructing internal service URLs or scraping the website.
  • When implementation lands, discard generated requests based on this planning record and rebuild them from the deployed OpenAPI operation.
Contract reference

This is a planned, non-executable contract. Do not send requests or register it as an executable agent tool.

Request and response

Make the request

Examples describe the reviewed planning contract and remain non-executable until promoted into OpenAPI.

PARAMETERS

Headers, path, query, and body

NAMELOCATIONPRESENCETYPE / RULES / PURPOSE
AuthorizationheaderRequired

Bearer tokenCredential containing trading:read authority.EXAMPLEBearer hc_live_…

cursorqueryOptional

opaque stringCursor returned by the previous page.EXAMPLEeyJvZmZzZXQiOjUwfQ

limitqueryOptional

integer · 1–200Maximum records to return.EXAMPLE50

statusqueryOptional

stringOptional lifecycle-state filter.EXAMPLEACTIVE

qqueryOptional

string · max 200Optional application search term.EXAMPLEtreasury

RESPONSES

Status and payload examples

200Canonical resource projection.Not executable · JSON RESPONSE+
{
  "result": "See the operation's authoritative OpenAPI response schema."
}
INTEGRATION DECISION
CALLER ACTION
Do not send this request or register it as an executable agent tool. Use the implemented alternatives linked by the module guide.
RETRY SAFETY
Do not retry on a timer. Re-fetch production OpenAPI and proceed only after this exact operation appears there.
STATE RECONCILIATION
No runtime state exists to reconcile for this planning contract. Continue from market-scoped catalog, order, trade, position, collateral, and settlement projections while Python remains authoritative through an implemented operation.
ESCALATE WHEN
Escalate any ambiguous order or settlement outcome while preserving suspension and Python authority; never enable ingress, publishing, allowlists, markets, or traffic as recovery.
401Bearer credential is missing, expired, or invalid.Not executable · JSON RESPONSE+
{
  "code": "request_failed",
  "message": "Bearer credential is missing, expired, or invalid."
}
INTEGRATION DECISIONrequest_failed
CALLER ACTION
Do not send this request or register it as an executable agent tool. Use the implemented alternatives linked by the module guide.
RETRY SAFETY
Do not retry on a timer. Re-fetch production OpenAPI and proceed only after this exact operation appears there.
STATE RECONCILIATION
No runtime state exists to reconcile for this planning contract. Continue from market-scoped catalog, order, trade, position, collateral, and settlement projections while Python remains authoritative through an implemented operation.
ESCALATE WHEN
Escalate any ambiguous order or settlement outcome while preserving suspension and Python authority; never enable ingress, publishing, allowlists, markets, or traffic as recovery.
403The principal lacks the required scope, role, tenant, or step-up authority.Not executable · JSON RESPONSE+
{
  "code": "request_failed",
  "message": "The principal lacks the required scope, role, tenant, or step-up authority."
}
INTEGRATION DECISIONrequest_failed
CALLER ACTION
Do not send this request or register it as an executable agent tool. Use the implemented alternatives linked by the module guide.
RETRY SAFETY
Do not retry on a timer. Re-fetch production OpenAPI and proceed only after this exact operation appears there.
STATE RECONCILIATION
No runtime state exists to reconcile for this planning contract. Continue from market-scoped catalog, order, trade, position, collateral, and settlement projections while Python remains authoritative through an implemented operation.
ESCALATE WHEN
Escalate any ambiguous order or settlement outcome while preserving suspension and Python authority; never enable ingress, publishing, allowlists, markets, or traffic as recovery.
422Path, query, or body validation failed.Not executable · JSON RESPONSE+
{
  "code": "request_failed",
  "message": "Path, query, or body validation failed."
}
INTEGRATION DECISIONrequest_failed
CALLER ACTION
Do not send this request or register it as an executable agent tool. Use the implemented alternatives linked by the module guide.
RETRY SAFETY
Do not retry on a timer. Re-fetch production OpenAPI and proceed only after this exact operation appears there.
STATE RECONCILIATION
No runtime state exists to reconcile for this planning contract. Continue from market-scoped catalog, order, trade, position, collateral, and settlement projections while Python remains authoritative through an implemented operation.
ESCALATE WHEN
Escalate any ambiguous order or settlement outcome while preserving suspension and Python authority; never enable ingress, publishing, allowlists, markets, or traffic as recovery.
503The authoritative service or read model is unavailable.Not executable · JSON RESPONSE+
{
  "code": "request_failed",
  "message": "The authoritative service or read model is unavailable."
}
INTEGRATION DECISIONrequest_failed
CALLER ACTION
Do not send this request or register it as an executable agent tool. Use the implemented alternatives linked by the module guide.
RETRY SAFETY
Do not retry on a timer. Re-fetch production OpenAPI and proceed only after this exact operation appears there.
STATE RECONCILIATION
No runtime state exists to reconcile for this planning contract. Continue from market-scoped catalog, order, trade, position, collateral, and settlement projections while Python remains authoritative through an implemented operation.
ESCALATE WHEN
Escalate any ambiguous order or settlement outcome while preserving suspension and Python authority; never enable ingress, publishing, allowlists, markets, or traffic as recovery.

OPERATIONAL NOTES

Security and lifecycle guarantees

  • The Rust gateway validates the public contract and routes only to the authoritative owner; clients never address internal services directly.

UPGRADING FROM V1

Legacy calls replaced by this operation

If you maintain an older integration, use this map to find the V2 replacement. Do not translate the old request field-for-field: rebuild it from the V2 parameters and schemas above because identity, authorization, replay protection, and response semantics may have changed.

GET/api/v1/exchange/order_metaMTF: Get MTF Order Details
Reference version and availability details

This planned contract now defines its public parameters, authorization boundary, replay behavior, responses, and authoritative owner. It remains non-executable until its owner adapter and conformance tests are promoted into the Rust gateway.

Return to the V2 directory